Skip to content
NORTHPEAK NorthPeak Developments home page

Homes and renovations

Renovate the home you have into the home you want.

An interior renovation happens in the middle of your daily life. We plan the sequence, protect the rest of the house and keep the scope in writing so the project ends where you expected it to.

Illustrative image detail. Not a completed NorthPeak project.
Suits you if
You are renovating kitchens, bathrooms, flooring or a whole floor and want it planned before it starts.
To scope it, we need
  • Your address and municipality
  • Which rooms or areas are in scope
  • The season or date you would like to be finished by

What usually prompts the call

Common concerns

  • Rooms that no longer suit how you live.
  • Fear of weeks without a kitchen or bathroom.
  • Quotes that are impossible to compare.
  • Older houses that hide surprises behind the walls.

What NorthPeak does about it

  • A room-by-room scope with stated finish allowances.
  • A sequence planned to shorten the time key rooms are out of use.
  • Dust and floor protection for the parts of the house not being renovated.
  • A defined process for anything discovered once walls are open.

What is in the scope

In a typical scope

  • Demolition and disposal
  • Framing and layout changes
  • Coordination of electrical and plumbing trades
  • Drywall, paint and trim
  • Flooring, cabinetry and fixture installation

Options to discuss

  • Kitchen renovation
  • Bathroom renovation
  • Flooring replacement
  • Whole-floor or whole-home renovation
  • Layout changes, subject to structural review

Your own scope is written for your house and may differ from this list.

What shapes the plan and the price

Cost drivers

  • Number of rooms and their size
  • Whether plumbing or walls are moved
  • Cabinet, counter, tile and fixture selections
  • Age and condition of existing wiring and plumbing

Permits and inspections

Structural, electrical, plumbing and gas work may require permits. Cosmetic work usually does not. Your scope states which applies.

We do not publish price ranges, because a range wide enough to be true is too wide to be useful. You receive a written estimate after a site visit, as a fixed price or a cost-plus contract.

How the work runs

  1. Step 1 · First

    Consultation and site visit

    We listen to what you want, look at the house and take measurements and photos. You learn what is feasible before you spend anything on design.

  2. Step 2 · After the site visit

    Written scope and estimate

    You receive a written scope that lists the work, the materials and the allowances. The estimate follows the scope line by line, so you can see what each part costs.

  3. Step 3 · Before any work starts

    Contract and schedule

    The contract sets the price structure, the payment schedule, how changes are approved and who is responsible for each permit. A written schedule comes with it.

  4. Step 4 · Before demolition

    Selections and ordering

    Long-lead items such as cabinets and tile are chosen and ordered so work is not held up waiting for materials.

  5. Step 5 · During the renovation

    Construction

    Demolition, rough-ins, drywall and finishing follow in sequence, with the house protected throughout.

  6. Step 6 · At completion

    Walkthrough and closeout

    We walk the finished work with you, list anything outstanding and complete it. You receive the inspection records and warranty documents that apply to your project.

Interior renovations: common questions

How long will my kitchen be out of use?

It depends on the scope and on cabinet lead times. Your written schedule shows the dates, and ordering is completed before demolition to keep that period short.

Can you match existing finishes?

Often closely, sometimes not exactly. We tell you before work starts when a match is unlikely.

What happens if you find something unexpected?

Work stops on that item. We show you what we found, explain the options and give you a written price for each. Nothing extra is built or billed until you approve it in writing.

Can you give me a price over the phone?

Not an honest one. Cost depends on the size and condition of the house, the finishes you choose and what the permits require. After a site visit you receive a written estimate tied to a written scope.

Related services

Plan your project

Ready to talk about interior renovations?

The service is already chosen. Add your municipality and when you would like to start, and we write the message to Gurdeep Singh. You read it, change it and send it.

Gurdeep Singh

Plan your project in four short steps

Your message goes to Gurdeep Singh on 587 896 0002. You review it and press send.

3. When would you like to start?
Your message will appear here once you have made all three choices.

Still to choose: a municipality, a timeline.

WhatsApp opens in a new tab with the message filled in. Nothing is sent until you press send.

CallWhatsAppPlan your project